MULTILEAP
A

Stage-wise Manufacturing & Wastage (Module 20)

Multi-stage manufacturing entry (Extrusion, Winding, Weaving, Lamination, Printing, Conversion, Cutting, Stitching, Packing), mass balance verification, WIP lot handoff, and shift/scrap performance.

Record Stage Manufacturing Output

📐 Technical Quality Measurements for EXTRUSION

⚖️ Real-Time Mass Balance Check

SRS Rule: Input quantity must balance with good output, waste, and rework within approved factory tolerance (±15% allowable process variance).

Input Quantity:0
Good Output:+0
Waste / Scrap:+0
Rework:+0
Total Output Accounted:0
Mass Balance Discrepancy:0.00
✔️ Mass Balance Passes Factory Tolerance